Location
Agent Comments
Discover the newest phase of Lakeland, a desirable community in Loxley offering beautifully designed new homes in a peaceful setting with convenient access to shopping, dining, and everything Baldwin County has to offer.
The Springsteen floor plan features 4 bedrooms, 2 full bathrooms, a versatile flex room, and a 2-car garage. The thoughtfully designed open-concept layout seamlessly connects the kitchen, dining area, and family room, creating a bright and inviting space perfect for entertaining and everyday living.
The stylish kitchen showcases quartz countertops, white shaker-style cabinetry, stainless steel appliances, and ample workspace. The private owner's suite offers a relaxing retreat, while three additional bedrooms provide comfort and flexibility. The dedicated flex room is ideal for a home office, playroom, fitness area, or hobby space.
Step outside to the spacious covered rear porch, perfect for relaxing or entertaining. The durable four-sided brick exterior provides timeless curb appeal and lasting durability, while a builder warranty offers added peace of mind.
Don't miss your opportunity to own a beautiful new home in Lakeland's newest phase! Schedule your tour today and ask about current builder incentives.
Information is deemed reliable but not guaranteed. Buyer or buyer's agent should verify all information. Pricing, features, and availability are subject to change without notice. Buyer to verify all information during due diligence.
Amenities
- Microwave
- Dishwasher
- Electric Range
- Smoke Detector
Interior Features
- Cool System: Heat Pump
- Heat System: Heat Pump
- Floors: Carpet
- Fireplaces: 0
- Interior: High Ceilings
Exterior Features
- Parking: Attached, Double Garage
- Roof: Dimensional
- View: None/Not Applicable
- Utilities: Loxley Utilitites
- Lot Features: Less Than 1 Acre
- Architectural Style: Single Story
Additional Features
- County: Baldwin
- Property Type: Residential Detached
- Tax Number: TBD
- Waterfront Features: No Waterfront
- Stories: 1
- Year Built: 2026